top of page

Custom Bath Remodeling

1. Initial Consultation:
Begin by scheduling a consultation with our bathroom design expert. Share your vision, preferences, and specific requirements for your custom bathroom.


2. Site Inspection:
We will conduct a thorough on-site inspection to assess the existing layout, plumbing, and electrical systems. This information will guide the design process.


3. Conceptual Design:
Based on your input and the site assessment, our design team will create initial conceptual designs for your custom bathroom, considering both functionality and aesthetic appeal.


4. Design Refinement:
Collaborate with our designers to refine the initial concepts. Discuss material choices, color schemes, and any modifications needed to ensure the design aligns with your vision.


5. Budget Planning:
Work with our financial consultants to establish a realistic budget for the project. Receive a detailed cost breakdown, allowing you to make informed decisions about materials and features.


6. Approval and Contract:
Once the design and budget are finalized, review and approve the detailed plan. Sign the contract, outlining project timelines, milestones, and responsibilities.


7. Demolition and Preparation:
Begin the remodeling process by safely demolishing existing structures and preparing the space for the new custom bathroom installation.


8. Plumbing and Electrical Work:
Coordinate with our specialized teams to handle any necessary plumbing or electrical modifications, ensuring your new bathroom meets safety standards and functional requirements.


9. Construction and Installation:
Our skilled craftsmen will start building and installing the custom elements of your bathroom, including fixtures, cabinetry, and other personalized features.


10. Tiling and Flooring:
Install tiles and flooring according to the approved design. Choose from a variety of materials that align with your aesthetic preferences and practical needs.


11. Installation of Fixtures:
Mount fixtures such as sinks, faucets, showerheads, and other bathroom accessories. Ensure proper alignment and functionality.


12. Painting and Finishing:
Apply the chosen color scheme and finish to walls and surfaces. This step adds the final touches to achieve the desired aesthetic.


13. Final Inspection:
Conduct a comprehensive final inspection with our team to ensure that every aspect of your custom bathroom meets your expectations and adheres to the agreed-upon design.


14. Client Orientation:
Once satisfied, we’ll provide you with an orientation, highlighting key features and offering maintenance tips for your new custom bathroom.


15. Post-Project Support:
Enjoy peace of mind with our post-project support. Should you have any questions or concerns, our team is ready to address them promptly.

Experience the luxury and functionality of a custom bathroom that suits your style and fits your daily routine.

 

Bath rremodel
Bath remodel
Bath remodel
bottom of page